PIB backgrounder: data centres get infrastructure status and incentives
Next story · 14 SepIndia approves up to 654 MW power export to flood-hit Nepal
A PIB backgrounder of 14 September 2026 explains India’s data centre push. Installed capacity grew from about 375 MW in 2020 to 1.57 GW by August 2026 and may reach nearly 8 GW by 2030. Data centres have had infrastructure status since Budget 2022-23, and Budget 2026-27 gave eligible foreign cloud firms a tax holiday until 2047.
- Released
- 14 Sep 2026, PIB
- Capacity
- about 375 MW (2020) to 1.57 GW (August 2026)
- Projection
- nearly 8 GW by 2030
- Infrastructure status
- Harmonized List, Union Budget 2022-23
- Tax holiday
- foreign cloud providers, Tax Years 2026-27 to 2046-47
- Investment
- about USD 70 billion underway; USD 90 billion announced
India’s data centre policy: what happened?
Every bank balance check, UPI payment or AI chat runs on servers in a data centre. As India goes digital, it needs many more of them, and they need land, power, cooling and water. This backgrounder pulls together what the Government is doing.
- Data centres were placed in the Harmonized List of Infrastructure in Union Budget 2022-23, giving easier access to long-term credit.
- Union Budget 2026-27 gave a tax holiday until 2047 to eligible foreign cloud service providers using India-based data centres.
- Installed capacity reached 1.57 GW by August 2026.
- CEA estimates data centre power demand could reach 17 GW by 2031-32.
- BIS has standards on PUE, CUE, CER and WUE to measure efficiency.
What is inside a data centre?
- Power: UPS for instant backup, plus generators.
- Cooling: HVAC, airflow management, liquid cooling.
- IT: servers, storage (HDDs and SSDs), networking, fibre links.
- Management software, virtualisation and automation.
What does the Government itself run?
- NIC has National Data Centres at its Delhi headquarters, Pune, Hyderabad and Bhubaneswar.
- NIC also runs 37 smaller data centres in State capitals.
Which linked schemes support data centres?
| Scheme | Key figure |
|---|---|
| Semicon 2.0 (approved 15.07.2026) | outlay ₹1,27,500 crore under ISM |
| IndiaAI Mission | outlay ₹10,371.92 crore |
| Electronics Components Manufacturing Scheme | allocation raised from ₹22,000 crore to ₹40,000 crore |
| PLI Scheme 2.0 for IT Hardware | domestic manufacturing of servers and hardware |
How does a data centre answer your request?
- Connect: request travels over the network
- Security layer checks it
- Load balancer sends it to a free server
- Application server works out what is needed (using APIs if required)
- Database server fetches the data
- Response returns to your device, often in 1 to 2 seconds
Why does India’s data centre policy matter?
| Angle | What to note |
|---|---|
| Economy | Investment of about USD 70 billion is underway, with USD 90 billion more announced. |
| Governance | e-Governance and digital payments depend on reliable data centres. |
| Sovereignty | Data stored in India supports data sovereignty and digital trust. |
| Energy | Demand could reach 17 GW by 2031-32, so clean power matters. |
| Technology | AI growth needs computing capacity and advanced cooling. |
What are the challenges in India’s data centre policy?
- Power: data centres must run every second; demand could reach 17 GW by 2031-32.
- Water: cooling needs water; groundwater use is regulated by Ministry of Jal Shakti guidelines.
- Carbon: energy use must shift to clean sources.
- Security: the release itself calls for strong standards and cybersecurity.
What should be done next on India’s data centre policy?
- Pair capacity growth with renewable and nuclear power (the SHANTI Act supports nuclear for data centres).
- Adopt closed-loop and liquid cooling to save water.
- Apply BIS efficiency standards and BEE building codes (ECBC 2017, ECSBC 2024).
- Build domestic skills in computing, semiconductors and energy.
What can Prelims ask on India’s data centre policy?
- Data centres got infrastructure status in Union Budget 2022-23 (Harmonized List).
- Capacity: about 375 MW (2020) to 1.57 GW (August 2026); nearly 8 GW by 2030.
- BIS committee LITD 31 covers cloud computing, IT and data centres.
- PUE = Power Usage Effectiveness; WUE = Water Usage Effectiveness.
- SHANTI Act: supports nuclear power, including Small Modular Reactors.
How to write about India’s data centre policy in Mains
Practice question (15 marks, 250 words): Data centres are the “invisible engines” of India’s digital economy. Discuss the policy support for them and the energy and water challenges they pose.
- Intro: 1.57 GW capacity (August 2026), nearly 8 GW by 2030.
- Policy: infrastructure status 2022-23; tax holiday to 2047; linked schemes.
- Challenges: power (17 GW by 2031-32), water, carbon, security.
- Responses: renewables, SHANTI Act, BIS and BEE standards, liquid cooling.
- Conclusion: data sovereignty and Viksit Bharat by 2047.
How to use this in Mains
- As per PIB (2026-09-14): PIB backgrounder describes data centres as core digital infrastructure and lists infrastructure status, fiscal incentives and clean-energy adoption as policy supports.
- Data localisation, AI compute and power/water demand make data centres a policy issue.
Quotable data pointPIB backgrounder describes data centres as core digital infrastructure and lists infrastructure status, fiscal incentives and clean-energy adoption as policy supports.
PIB: PIB Backgrounder: Data centres in India, 14 Sep 2026
Exam angle
Mains: Data centres and India's AI ambitions: opportunities and environmental costs.
Practice MCQs
Original practice questions (not PYQs).
Data centres were included in the Harmonized List of Infrastructure in the Union Budget of
Answer (b) & explanation
PIB backgrounder, 14 Sep 2026.
In data centres, "WUE" measures
Answer (b) & explanation
PIB, 14 Sep 2026: BIS standards cover PUE, CUE, CER and WUE.
Which Act, mentioned in 2026, supports nuclear power for sectors such as AI and data centres?
Answer (a) & explanation
PIB, 14 Sep 2026.
Questions students ask about this
When did data centres get infrastructure status in India?
In Union Budget 2022-23, when they were included in the Harmonized List of Infrastructure.
What is India's data centre capacity?
About 1.57 GW as of August 2026, up from around 375 MW in 2020.
What tax benefit did Budget 2026-27 give?
A tax holiday until 2047 for eligible foreign cloud service providers using India-based data centres, covering Tax Years 2026-27 to 2046-47.
What is PUE?
Power Usage Effectiveness, a measure of how efficiently a data centre uses electricity; BIS has a standard for it.