Cabinet clears Nashik-Solapur-Akkalkot greenfield corridor

Battle IAS current affairs title card: Cabinet clears Nashik-Solapur-Akkalkot greenfield corridor (GS3 · Infrastructure, 31 December 2025)

What happened

  • The CCEA approved a 374 km six-lane greenfield access-controlled corridor from Nashik to Akkalkot via Solapur in Maharashtra, costing ₹19,142 crore, on BOT (Toll) mode [PIB].
  • It will link with the Delhi-Mumbai Expressway near the Vadhawan port interchange, the Agra-Mumbai corridor at Nashik and the Samruddhi Mahamarg at Pangri, giving a west-coast-to-east-coast route towards Chennai [PIB].

Background

  • BOT (Toll) means the private developer builds and runs the road and recovers money through tolls. Planning follows PM Gati Shakti [PIB].

Why it matters

  • A toll-based model brings in private money but traffic risk sits with the developer. Many earlier BOT projects stalled on that risk.

How to use this in Mains

GS-III Infrastructure: energy, ports, roads, airports, railways; investment models

  1. As per PIB (2025-12-31): the CCEA approved a 374 km six-lane greenfield access-controlled corridor from Nashik to Akkalkot via Solapur in Maharashtra, costing ₹19,142 crore, on BOT (Toll) mode.
  2. A toll-based model brings in private money but traffic risk sits with the developer. Many earlier BOT projects stalled on that risk.
Quotable data point

The CCEA approved a 374 km six-lane greenfield access-controlled corridor from Nashik to Akkalkot via Solapur in Maharashtra, costing ₹19,142 crore, on BOT (Toll) mode.

PIB: Cabinet: Nashik-Solapur-Akkalkot corridor, 31 Dec 2025

Exam angle

UPSC

Prelims: BOT vs HAM. · Mains: PPP in highways.

Practice MCQs

Original practice questions (not PYQs).

Practice · UPSC

Length of the Nashik-Solapur-Akkalkot corridor

Answer (b) & explanation

PIB.

Practice · UPSC

Mode of execution

Answer (c) & explanation

PIB.

Practice · UPSC

Which port interchange will it link with?

Answer (b) & explanation

PIB.

Go deeper

Official source: PIB: Cabinet: Nashik-Solapur-Akkalkot corridor, 31 Dec 2025