UPPCS GS-VI

IMLC near Ganga Expressway in Meerut

Battle IAS UP current affairs title card: IMLC near Ganga Expressway in Meerut (, 10 March 2026)
Battle Brief

On 10 March 2026 the UP Cabinet approved ₹21381.93 lakh, the capital cost assessed by the Expenditure Finance Committee, to build an Integrated Manufacturing and Logistics Cluster near the Ganga Expressway in Meerut on EPC mode. It is part of UPEIDA’s industrial corridor project, which plans such clusters at 29 sites along the state’s expressways.

Fact File

Date
10 March 2026, UP Cabinet
Project
IMLC, Meerut node, near Ganga Expressway
Cost
₹21381.93 lakh (capital items, EFC-assessed)
Mode
EPC (engineering, procurement, construction)
Funding
Atal Industrial Infrastructure Mission
Wider plan
IMLCs at 29 sites along UPEIDA expressways
In the news

The Meerut IMLC on the Ganga Expressway: what happened?

An expressway alone moves cars. Put factories and warehouses next to it, and it becomes an industrial corridor. UP is building clusters of ready land with roads, water and power along its expressways. Meerut, on the Ganga Expressway, is one of them.

  • The Cabinet approved the EFC-assessed capital cost for the Meerut IMLC.
  • Works include roads, RCC drains and culverts, a fire station, an underground reservoir, water supply lines, fencing and electricity.
  • Funding comes from the Atal Industrial Infrastructure Mission.
Back Story

Which expressways get IMLCs?

  • Agra-Lucknow, Purvanchal, Bundelkhand and Gorakhpur Link expressways, and the Ganga Expressway under development.
  • In all, 29 sites are planned under UPEIDA’s industrial corridor project.
Why examiners care

Why does the Meerut IMLC on the Ganga Expressway matter?

  • Industry: Ready land with services draws manufacturing to western UP.
  • Logistics: Factories sit next to a high-speed freight route.
Exam Radar

What can Prelims ask on the Meerut IMLC on the Ganga Expressway?

  • IMLC: Integrated Manufacturing and Logistics Cluster; UPEIDA plans 29 along expressways.
  • Meerut IMLC: ₹21381.93 lakh; EPC mode; Atal Industrial Infrastructure Mission.

How to use this in Mains

GS-VI industrial corridors

  1. Clusters next to expressways turn roads into industrial corridors.
Quotable data point

The Cabinet approved ₹21381.93 lakh for an Integrated Manufacturing and Logistics Cluster (IMLC) near the Ganga Expressway in Meerut on EPC mode [UP Cabinet].

UP Information Dept: Cabinet decisions, 10 March 2026 (Hindi PDF)

Exam angle

UPPCS

GS-VI: industry and expressways of UP. Use IMLCs to explain how expressways become industrial corridors.

Practice MCQs

Original practice questions (not PYQs).

Practice · UPPCS

Under UPEIDA's industrial corridor project, Integrated Manufacturing and Logistics Clusters are planned at how many sites?

Answer (c) & explanation

UP Cabinet note, 10 March 2026.

Quick questions

Questions students ask about this

What is an IMLC?

An Integrated Manufacturing and Logistics Cluster: serviced industrial land with roads, water, power and logistics next to an expressway.

How much was approved for the Meerut IMLC?

₹21381.93 lakh, the capital cost assessed by the Expenditure Finance Committee.

How many IMLC sites does UPEIDA plan?

29 sites along its expressways.

Keep studying

Official source: UP Information Dept: Cabinet decisions, 10 March 2026 (Hindi PDF)

facts from cited sources only; numbers machine-checked against source text; faculty review pending