Gorakhpur’s Godhoiya nala revived under AMRUT 2.0

Battle IAS UP current affairs title card: Gorakhpur's Godhoiya nala revived under AMRUT 2.0 (, 15 May 2026)
Battle Brief

On 15 May 2026 the UP Chief Minister inspected the ₹495 crore Godhoiya nala project in Gorakhpur, built under AMRUT 2.0 by Jal Nigam (Urban). Physical progress was 95 per cent, with 9.25 km of drain, a 38 MLD sewage treatment plant and a 61 MLD pumping station built. He asked for completion by 15 June, before the monsoon.

Fact File

Date
15 May 2026, Gorakhpur
Scheme
AMRUT 2.0
Cost
₹495 crore
Agency
Jal Nigam (Urban)
Built
9.25 km drain; 38 MLD STP; 61 MLD pumping station; 14 bridges/culverts
Benefit
about 5 lakh people in the north of the city
In the news

The Godhoiya nala project in Gorakhpur: what happened?

Godhoiya was once a small river that turned into a dirty drain feeding Ramgarh Tal. It caused filth, mosquitoes and waterlogging. The project separates sewage from the channel so that only treated, clean water flows in it.

  • The CM inspected the ₹495 crore Godhoiya nala project in Gorakhpur under AMRUT 2.0, due by 15 June. [UP CM press note]
  • It has a 38 MLD STP; 9.25 km of drain has been built and physical progress is 95 per cent. [UP CM press note]
Back Story

What does the project include?

  • A pucca drain, diversion, interception and treatment of sewage.
  • 17.50 km of the 17.94 km intercepting sewer line had been laid.
  • The 38 MLD STP and the pumping station were on trial run.
  • The RCC drain, about 9.5 km long and 9 metres wide, will carry rainwater via Ramgarh Tal and Tarkulani to the Rapti river.
  • Separate underground sewer and drainage lines run on both sides; roads along the banks are being built.
Back Story

What did the CM say?

  • The project will end waterlogging in half the city before this monsoon.
  • Plantation will be done on both banks during Van Mahotsav.
  • Citizens should not throw plastic, cloth or waste into drains.
Exam Radar

What can Prelims ask on the Godhoiya nala project in Gorakhpur?

  • Godhoiya nala project, Gorakhpur: AMRUT 2.0; ₹495 crore; 38 MLD STP.
  • Water flows via Ramgarh Tal and Tarkulani to the Rapti.

How to use this in Mains

GS-VI urban water

  1. Turning a dead drain into a treated channel solves both flooding and pollution.
Quotable data point

The CM inspected the ₹495 crore Godhoiya nala project in Gorakhpur under AMRUT 2.0, due by 15 June [UP CM press note].

UP Information Dept, CM press note 2026-05-15: मुख्यमंत्री ने गोरखपुर में अमृत 2.0 कार्यक्रम के तहत 495 करोड़ रु0 की लागत से निर्माणाधीन गोड़धोइया नाला परियोजना के कार्यों का निरीक्षण किया (Hindi PDF)

Exam angle

UPPCS

GS-VI: urban water management in UP. Use Godhoiya as a model of reviving a dead drain by separating sewage and treating it.

Practice MCQs

Original practice questions (not PYQs).

Practice · UPPCS

The Godhoiya nala project in Gorakhpur is being built under

Answer (b) & explanation

UP CM press note, 15 May 2026.

Quick questions

Questions students ask about this

What is the Godhoiya nala project?

A ₹495 crore AMRUT 2.0 project in Gorakhpur to build a pucca drain and divert, intercept and treat sewage, reviving a dead drain.

What is the capacity of its STP?

38 MLD, with a 61 MLD pumping station.

Into which river will the drain carry rainwater?

The Rapti, via Ramgarh Tal and Tarkulani.