GS3 · Aviation

PM launches “Viksit UDAN”, next phase of regional connectivity

Battle IAS current affairs title card: PM launches "Viksit UDAN", next phase of regional connectivity (GS3 · Aviation, 4 July 2026)
Asked by UPSCMains 2024 (GS3)1 PYQ

UPSC has already asked about this. Read the story with these questions in mind.

Battle Brief

On 4 July 2026 the Prime Minister launched the next phase of UDAN, Viksit UDAN, at Jodhpur and opened the city’s new ₹480 crore airport terminal. The Modified UDAN Scheme, approved by the Cabinet on 25 March 2026, carries about ₹29,000 crore over ten years for 100 new aerodromes, 200 helipads and continued viability gap funding.

Fact File

Launch
4 Jul 2026, Jodhpur; Ministry of Civil Aviation
Cabinet approval
25 March 2026, Modified UDAN Scheme
Outlay
about ₹29,000 crore over the next ten years
UDAN so far (since October 2016)
669 routes; 95 airports, heliports and water aerodromes; over 1.66 crore passengers
Jodhpur terminal
₹480 crore, AAI; 20 lakh passengers a year
Indigenous aircraft
HAL Dhruv and Dornier platforms for remote routes
In the news

The Modified UDAN Scheme: what happened?

UDAN (Ude Desh ka Aam Nagrik) began in October 2016 with one idea: a person in a small town should be able to fly. Ten years on, the Government has extended it for another decade with a bigger purse and a new focus: build the airstrips and helipads that small towns still lack.

  • The PM launched the next phase of UDAN, called Viksit UDAN, from Jodhpur.
  • He opened the New Terminal Building at Jodhpur Airport, built by the Airports Authority of India for ₹480 crore.
  • The Modified UDAN Scheme was approved by the Union Cabinet on 25 March 2026 with about ₹29,000 crore for ten years.
  • It funds 100 aerodromes from unserved airstrips, 200 helipads, O&M support for regional airports and viability gap funding (VGF) for airlines.
Back Story

What is the UDAN scheme?

  • A regional connectivity scheme launched in October 2016 to make flying affordable from Tier-2 and Tier-3 cities and remote regions.
  • The slogan used by the Ministry is “Hawai Chappal se Hawai Jahaz”.
  • By July 2026 it had run 669 routes and connected 95 airports, heliports and water aerodromes, carrying over 1.66 crore passengers.
  • VGF pays airlines part of the cost of flying routes that are not yet profitable.
Back Story

What is new in the Modified UDAN Scheme?

  • The money now goes mainly into infrastructure: new aerodromes and helipads, not only airline subsidy.
  • It backs indigenous aircraft and helicopters, including HAL Dhruv and Dornier, for underserved and remote regions.
  • It runs for the next ten years, in line with Viksit Bharat 2047.
Rulebook

Which constitutional entry covers civil aviation?

  • Union List (List I), Entry 29: “Airways; aircraft and air navigation; provision of aerodromes; regulation and organisation of air traffic and of aerodromes; provision for aeronautical education and training and regulation of such education and training provided by States and other agencies.”
  • Aerodromes and air traffic are therefore Union subjects; UDAN is run by the Union Ministry of Civil Aviation.
By the numbers

Where does the ₹29,000 crore go?

Modified UDAN Scheme components (PIB, Civil Aviation, 4 Jul 2026)
ComponentAmount
100 aerodromes from unserved airstrips₹12,159 crore
Viability Gap Funding for regional flights₹10,043 crore
200 modern helipads₹3,661 crore
O&M support for regional airports₹2,577 crore
Named components together₹28,440 crore (of about ₹29,000 crore)

The last row adds the four amounts given in the release.

By the numbers

What does the new Jodhpur terminal offer?

Jodhpur New Terminal Building (PIB, 4 Jul 2026)
FeatureFigure
Cost₹480 crore (AAI)
Area23,342 sq m
Capacity1,500 peak-hour passengers; 20 lakh a year (old terminal about 4 lakh)
Check-in counters / aerobridges20 / six
Apron11 A-321 and one ATR-72
Green target5-Star GRIHA rating
Why examiners care

Why does the Modified UDAN Scheme matter?

AngleWhat to note
EconomyRegional airports bring tourism, trade and jobs to Tier-2 and Tier-3 towns.
InfrastructureThe largest single component (₹12,159 crore) builds aerodromes: the scheme moves from subsidy to assets.
Atmanirbhar BharatIndigenous Dhruv and Dornier platforms get a home market.
InclusionHelipads and small aerodromes reach hill, island and remote areas.
Fault Lines

What are the challenges in the Modified UDAN Scheme?

  • VGF of ₹10,043 crore shows many regional routes still need support to survive.
  • New aerodromes need airlines willing to fly; infrastructure alone does not create traffic.
  • Jodhpur’s old terminal had saturated at about 4 lakh passengers; capacity planning must stay ahead of demand at other regional airports too.
  • O&M money (₹2,577 crore) is small next to the build budget; upkeep of small airports is a long-term cost.
Road Ahead

What should be done next on the Modified UDAN Scheme?

  • Pick the 100 airstrips where demand and tourism potential are proven.
  • Tie VGF to service reliability so routes are not abandoned.
  • Use helipads for medical evacuation and disaster relief, not only tourism.
Exam Radar

What can Prelims ask on the Modified UDAN Scheme?

  • UDAN launched October 2016; 669 routes, 95 aerodromes, over 1.66 crore passengers.
  • Modified UDAN approved by Cabinet on 25 March 2026: about ₹29,000 crore for ten years.
  • Components: 100 aerodromes (₹12,159 crore), 200 helipads (₹3,661 crore), VGF ₹10,043 crore, O&M ₹2,577 crore.
  • Indigenous platforms named: HAL Dhruv, Dornier.
  • Civil aviation and aerodromes: Union List Entry 29.
Answer Lab

How to write about the Modified UDAN Scheme in Mains

Practice question (10 marks, 150 words): Regional air connectivity has moved from route subsidies to building infrastructure. Discuss with reference to the Modified UDAN Scheme.

  • Intro: UDAN since 2016; numbers achieved.
  • Modified UDAN: ₹29,000 crore, aerodromes, helipads, VGF, O&M.
  • Gains: tourism, trade, remote access, indigenous aircraft.
  • Limits: traffic risk, upkeep cost.
  • Conclusion: Viksit Bharat 2047 and last-mile flying.

How to use this in Mains

GS-III Infrastructure: energy, ports, roads, airports, railways; investment models

  1. As per PIB (2026-07-04): PM launched the next phase of UDAN (Viksit UDAN) and inaugurated Jodhpur Airport's new terminal.
  2. It extends flights to smaller cities.
Quotable data point

PM launched the next phase of UDAN (Viksit UDAN) and inaugurated Jodhpur Airport's new terminal.

PIB: Civil Aviation: Viksit UDAN, 4 Jul 2026

Exam angle

UPSC

Prelims: UDAN.

Practice MCQs

Original practice questions (not PYQs).

Practice · UPSC

Under the Modified UDAN Scheme approved in March 2026, how many modern helipads are to be developed?

Answer (c) & explanation

PIB (Civil Aviation), 4 Jul 2026: 200 helipads with ₹3,661 crore.

Practice · UPSC

The subject "provision of aerodromes" is placed in which list of the Seventh Schedule?

Answer (a) & explanation

Constitution of India, Seventh Schedule, List I, Entry 29.

Quick questions

Questions students ask about this

What is Viksit UDAN?

It is the next phase of the UDAN regional connectivity scheme, launched by the Prime Minister on 4 July 2026 under the Modified UDAN Scheme.

What is the outlay of the Modified UDAN Scheme?

About ₹29,000 crore over the next ten years, approved by the Union Cabinet on 25 March 2026.

How many aerodromes and helipads will the scheme build?

100 aerodromes from existing unserved airstrips and 200 modern helipads.

What has UDAN achieved since 2016?

669 routes, 95 airports, heliports and water aerodromes connected, and over 1.66 crore passengers, as per the release.

Keep studying

Go deeper

Official source: PIB: Civil Aviation: Viksit UDAN, 4 Jul 2026

facts from cited sources only; faculty review pending