Chapter 3 · Topic 3.2 · Prelims + Mains2 of 2

Community & Technology in DM: Early warning and mapping

Key points

  • Four parts of early warning: know the risk, monitor and forecast, spread the warning, people able to act.
  • SACHET (NDMA, built by C-DOT) sends location-based SMS alerts using the Common Alerting Protocol; INCOIS warns of tsunamis.
  • Hazard zonation colours land from very high to low risk; GSI has mapped about 4.3 lakh sq km at 1:50,000.

Prelims box: facts and traps

Agency or systemWarns about
IMDCyclones, heavy rain, heatwaves, lightning
Central Water CommissionRiver floods
INCOIS, HyderabadTsunamis, storm surges, high waves
Geological Survey of IndiaLandslide forecasts
SACHET (NDMA, C-DOT)Location-based SMS alerts (CAP)
Damini appLightning
  • Trap: river flood forecasts come from the Central Water Commission, not IMD.
  • Mission Mausam (2024) aims for a ‘weather-ready and climate-smart’ India.

Early warning systems

Quick answerAn early warning system tells people about danger in time to act. It has four links, and fails if any one breaks.

It has four parts: knowing the risk, monitoring and forecasting, spreading the warning, and the public’s ability to act on it. Like a smoke alarm, it’s useless if nobody knows the exit. India’s cyclone death toll fell because all four improved together. The UN’s Early Warnings for All plan (2022) wants every person on Earth covered by 2027.

Agency or systemWarns about
IMD (Doppler radars, INSAT-3D/3DR satellites, impact-based forecasts)Cyclones, heavy rain, heatwaves, lightning
Central Water CommissionRiver floods
INCOIS, HyderabadTsunamis, storm surges, high waves
Geological Survey of IndiaRegional landslide forecasts
NDMA’s Integrated Alert System (SACHET), built by C-DOTLocation-based SMS alerts using the Common Alerting Protocol
Mobile apps: Mausam, Meghdoot, DaminiWeather, farm advisories, lightning

“Impact-based” means saying what the weather will do (“roofs may fly off”), not just what it is (“winds of 150 km/h”).

Mission Mausam (2024) aims to make India ‘weather-ready and climate-smart’ with more radars and better models. ISRO’s National Database for Emergency Management gives responders maps and satellite data.

What UPSC asks: four parts, SACHET uses CAP.

Hazard zonation mapping

Mains 2019 stated: Disaster preparedness is the first step in any disaster management process. It asked how hazard zonation mapping will help disaster mitigation in the case of landslides. Zonation divides land into very high to low hazard zones, using slope, geology, rainfall, land use and past slides. It helps by:

  • keeping houses, schools and hospitals out of very high zones,
  • guiding safe road alignment and slope protection,
  • placing rain gauges and warning sensors where they matter,
  • planning evacuation routes.

The Geological Survey of India has mapped landslide susceptibility for about 4.3 lakh sq km at 1:50,000.

Asked by UPSCUPSC Mains 2019 · GS Paper III · Q18 · 15 marks

Disaster preparedness is the first step in any disaster management process. Explain how hazard zonation mapping will help disaster mitigation in the case of landslides.

The same idea works for flood plains, city quake maps, cyclone and heatwave maps.

What UPSC asks: GSI 1:50,000 maps.

Mains box: analysis and answer points

  • Hazard zonation for landslides (Mains 2019, 15 marks): what goes into the map, then four uses (siting, roads, sensors, evacuation), with the GSI 1:50,000 mapping as proof.
  • Value addition: impact-based forecasting and the UN Early Warnings for All target of 2027.
  • Next likely angle: last-mile alerts and why warnings fail.

Practice

Write an answer

In 150 words, explain the significance of Community & Technology in DM with one recent example.

Flashcards (13)

Four parts of early warning?

Risk knowledge, monitoring, dissemination, response.

River flood forecasts?

Central Water Commission.

Tsunami warnings?

INCOIS, Hyderabad.

SACHET built by?

C-DOT, for NDMA.

Alert standard used?

Common Alerting Protocol.

Lightning app?

Damini.

Farm weather app?

Meghdoot.

Mission Mausam year?

2024.

NDEM run by?

ISRO.

Hazard zonation uses?

Slope, geology, rain, land use, past slides.

GSI landslide map scale?

1:50,000.

Area mapped by GSI?

About 4.3 lakh sq km.

Seismic microzonation?

City-level quake hazard maps.

In the news

Disaster Management →All Disaster Management topics

Syllabus: GS-III · Disaster and disaster management.

Read these notes on battleias.com